
|
Approved Distribution & Retail Supply Tariff for FY 2012-13 applicable w.e.f 1st April, 2012 |
|||||||||||||
|
Sr. No. |
Category of consumers |
Tariff for 2011-12 |
Tariff for 2012-13 |
||||||||||
|
Energy Charges (Paise / kWh) |
Fixed Charge (Rs. per kW of the connected load / per kVA of sanctioned contract demand in case supply is on HT) per month |
FSA (Paise / kW) |
MMC (Rs. per kW per month of the connected load or part thereof ) |
Energy Charges (Paise / kWh or/ kVAh) |
Fixed Charge (Rs. per kW of the connected load / per kVA of sanctioned contract demand (in case supply is on HT) per month or as indicated |
FSA (Paise / kWh) |
MMC (Rs. per kW per month of the connected load or part thereof) |
||||||
|
1 |
Domestic (LT) |
||||||||||||
|
Upto 40 units per month |
263 |
Nil |
20 |
Rs. 80 upto 2 kW and Rs. 70 above 2 kW |
270 / kWh |
Nil |
15 |
Rs. 80 upto 2 kW and Rs. 50 above 2 kW |
|||||
|
41 - to 250 units per month |
380 |
Nil |
34 |
450/ kWh |
Nil |
27 |
|||||||
|
251 to 400 units per month |
380(for units 251-300) |
Nil |
34 Paise for 251 to 300 units and 44 Paise for 301 units and above |
525/ kWh |
Nil |
27 Paise for 251 to 300 units and 36 Paise for 301 units and above |
|||||||
|
401 and above units per month |
465(for units 401-500) |
Nil |
44 |
560/ kWh |
Nil |
36 |
|||||||
|
2 |
Non Domestic |
||||||||||||
|
Upto 5 kW (LT) |
450 |
Nil |
38 |
Rs. 180 upto 5 kW and Rs. 160 above 5 kW upto 20 kW |
525 / kWh |
Nil |
30 |
Rs. 180 upto 5 kW and Rs. 160 above 5 kW upto 20 kW |
|||||
|
Above 5 kW and Up to 20 kW (LT) |
450 |
Nil |
38 |
550 / kWh |
Nil |
30 |
|||||||
|
Above 20 kW upto 50 kW (LT) |
470 |
115 |
38 |
Nil |
550 / kWh |
130 /kW |
30 |
Nil |
|||||
|
Existing consumers above 50 kW upto 70 kW (LT) |
470 |
115 |
38 |
Nil |
575 / kWh |
150 /kW |
30 |
Nil |
|||||
|
Consumers above 50 kW (HT) |
470 |
115 |
38 |
Nil |
525 / kWh |
130 /kW |
30 |
Nil |
|||||
|
3 |
HT Industry( above 50 kW) |
||||||||||||
|
Supply at 11 KV |
415 |
120 |
38 |
Nil |
470/ kVAh |
130 / kVA |
30 |
Nil |
|||||
|
Supply at 33 KV |
403 |
120 |
38 |
Nil |
460/ kVAh |
130 / kVA |
30 |
Nil |
|||||
|
Supply at 66 KV or 132 KV |
391 |
120 |
38 |
Nil |
450/ kVAh |
130 / kVA |
30 |
Nil |
|||||
|
Supply at 220 KV |
383 |
120 |
38 |
Nil |
440/ kVAh |
130 / kVA |
30 |
Nil |
|||||
|
Supply at 400 kV |
--- |
--- |
--- |
--- |
435/ kVAh |
130 / kVA |
30 |
Nil |
|||||
|
Arc furnaces/Steel Rolling Mills if supply is at 11 kV |
415+15 |
120 |
38 |
Nil |
470+18Paise per kVAh |
130 /kVA |
30 |
Nil |
|||||
|
4 |
LT Industry (upto 50 kW) |
||||||||||||
|
Up to 20 kW |
440 |
Nil |
39 |
150 |
535/ kWh |
Nil |
31 |
Rs. 150 /kW |
|||||
|
Above 20 kW upto 50 kW |
440 |
75 |
39 |
Nil |
510/ kWh |
150 /kW |
31 |
Nil |
|||||
|
Existing consumers Above 50 kW upto 70 kW (LT) |
440 |
75 |
39 |
Nil |
498 / kVAh |
150 /kW |
31 |
Nil |
|||||
|
5 |
Agriculture |
||||||||||||
|
Metered: (i) with motor upto 15 BHP |
25 |
Nil |
Nil |
Rs. 200 / BHP per year |
25 / kWh |
Nil |
Nil |
Rs. 200 / BHP per year |
|||||
|
(ii) with motor above 15 BHP |
25 |
Nil |
Nil |
20 / kWh |
Nil |
Nil |
|||||||
|
Un-metered (Rs. / Per BHP / Month): (i) with motor upto 15 BHP |
Nil |
35 |
Nil |
Nil |
Nil |
35 |
Nil |
Nil |
|||||
|
(ii) with motor above 15 BHP |
Nil |
35 |
Nil |
Nil |
Nil |
30 |
Nil |
Nil |
|||||
|
6 |
Public Water Works |
425 |
145 |
37 |
Nil |
510 / kWh |
150 /kW |
29 |
Nil |
||||
|
7 |
Lift Irrigation |
430 |
120 |
37 |
Nil |
510 / kWh |
150 / BHP |
29 |
Nil |
||||
|
8 |
MITC |
430 |
120 |
37 |
Nil |
510 / kWh |
150 /BHP |
29 |
Nil |
|
|||
|
9 |
Railway Traction |
|
|||||||||||
|
Supply at 11 KV |
455 |
125 |
37 |
Nil |
530 / kWh |
125 /kVA |
29 |
Nil |
|
||||
|
Supply at 33 KV |
443 |
125 |
37 |
Nil |
520 /kWh |
125 /kVA |
29 |
Nil |
|
||||
|
Supply at 66 or 132 kV |
431 |
125 |
37 |
Nil |
510 / kWh |
125 /kVA |
29 |
Nil |
|
||||
|
Supply at 220 kV |
423 |
125 |
37 |
Nil |
500 / kWh |
125 /kVA |
29 |
Nil |
|
||||
|
10 |
DMRC |
|
|||||||||||
|
Supply at 66 kV |
395 |
125 |
37 |
Nil |
450 / kWh |
125 /kVA |
29 |
Nil |
|
||||
|
Supply at 132 kV |
380 |
125 |
37 |
|
450 /kWh |
125 /kVA |
29 |
Nil |
|
||||
|
11 |
Bulk Supply |
|
|||||||||||
|
Supply at LT |
440 |
130 |
38 |
Nil |
525 / kWh |
130 /kW |
30 |
Nil |
|
||||
|
Supply at 11 kV |
430 |
130 |
38 |
Nil |
515 / kWh |
130 /kW |
30 |
Nil |
|
||||
|
Supply at 33 kV |
418 |
130 |
38 |
Nil |
505 / kWh |
130 /kW |
30 |
Nil |
|
||||
|
Supply at 66 or 132 kV |
406 |
130 |
38 |
Nil |
500 / kWh |
130 /kW |
30 |
Nil |
|
||||
|
Supply at 220 kV |
398 |
130 |
38 |
Nil |
495 / kWh |
130 /kW |
30 |
Nil |
|
||||
|
12 |
Bulk Supply Domestic (70 kW and above at 11 kV or above voltage) |
360 |
50 /KW of recorded demand |
38 |
Nil |
390 / kWh |
50 /kW of recorded demand |
30 |
Nil |
|
|||
|
13 |
Street Lighting |
415 |
Nil |
38 |
150 |
495 / kWh |
Nil |
30 |
150 /kW |
|
|||
|
14 |
Independent Hoarding / Decorative Lightning |
650 |
120 |
38 |
Nil |
695 / kWh |
150 /kW |
30 |
Nil |
|
|||
|
15 |
Temporary Metered supply |
1.5 times the energy charges of relevant category for which temporary supply has been sought. MMC and fixed charges, wherever applicable, shall be leviable at the same rates as in case of regular connection. |
|
||||||||||
Notes:
1. 80% of the connected load shall be taken into account for levying fixed charges where leviable in case of LT industrial Supply
2. Energy charges for HT industrial and existing LT industrial consumer categories having load above 50 kW to 70 kW are in Paise / kVAh
3. Fixed charges for unmetered AP consumers, MITC and lift irrigation category are in Rs. / per BHP / Month.
4. Fixed charges for HT industrial supply category, are in Rs. / kVA of Contract Demand. For Railways and DMRC, the fixed charges are in Rs. / kVA of the billable demand. For all other consumer categories (except Bulk Supply Domestic), the fixed charges are in Rs. / kW of the connected load or part thereof per month.
5. Fixed charges for Bulk Supply Domestic are in Rs. / kW of the recorded demand.
6. Supply charges in case of Domestic consumer category are telescopic in nature.
7. The above tariff does not include electricity duty and municipal tax.
Transmission and SLDC
Charges (FY 2012-13)
Applicable w.e.f 1st April, 2012
The recovery of transmission cost shall be @ Rs. 266.22 Millions (UHBVNL) and Rs. 259.28 million (DHBVNL) per month.
A total monthly recovery of SLDC charges of Rs. 9.4775 Million shall be made from UHBVNL and DHBVNL in 50:50 proportion.
Transmission tariff for short-term open access customers shall be Rs. 0.21 / kWh.
Generation Tariff (HPGCL)
(FY 2012-13)
Applicable w.e.f 1st April, 2012
|
|
PTPS (Unit 1-4) |
PTPS (Unit 5 ) |
PTPS (Unit 6) |
PTPS (Unit 7 & 8) |
DCRTPS (Unit 1&2) |
RGTPS (Unit 1 &2) |
WYC & Kakroi |
Total HPGCL |
|
Energy Charges (Rs./kWh) |
3.23 |
2.58 |
2.58 |
2.51 |
2.13 |
2.30 |
0.00 |
2.41 |
|
Fixed Charges (Rs./kWh) |
0.83 |
0.48 |
0.84 |
0.81 |
1.02 |
0.97 |
1.17 |
0.90 |
|
Total Charges Rs. / kWh |
4.06 |
3.06 |
3.42 |
3.32 |
3.15 |
3.27 |
1.17 |
3.31 |
Tariff for Electricity from Renewable Energy Sources to be commissioned in FY 2012-13
(Being determined)
Wheeling Charges and cross
subsidy surcharge for Distribution Open Access Consumers
Applicable w.e.f 1st April, 2012
Wheeling charges
|
Rate |
51 Paise per Unit |
Cross subsidy surcharge
|
Sr. No. |
Consumer Category |
Cross subsidy surcharge for 2012-13 (Paise / Unit) |
|
1 |
HT industry |
92 |
|
2 |
NDS HT |
80 |
|
3 |
Bulk supply other than domestic |
92 |
|
4 |
Railways |
78 |